| |
Choosing who will repair, sand, and finish
your wood floor is just as important as the floor itself.
We at David Wood Floors, Inc. Pride ourselves
in the quality of our workmanship and follow NWFA specification
and honor time proven techniques that provide you with the
best finished results, as well
as using superior products.
We strive to make your existing wood floor
the best that your existing wood can be. Even if that old floor
had been covered with linoleum or tile or rugs before it was uncovered.
Individual Boards can be replaced, cold
air returns that are currently only plywood can be patched
and new wood put in place so that you will never know it was
patched.
Boarders and inlays of wood can be added
to an existing wood floor to make the floor a unique part of
your home.
WHAT
YOU CAN EXPECT FROM US |
| SANDING AND REFINISHING YOUR WOOD
FLOORS WILL ADD VALUE AND BEAUTY TO YOUR HOME, BUT
AS WITH ANY HOME IMPROVEMENT YOU SHOULD EXPECT SOME
DISRUPTIONS AND INCONVENIENCE. WE WILL EMPLOY OUR EXPERIENCE,
THE LATEST EQUIPMENT AND THE MOST ENVIRONMENTALLY SAFE
MATERIALS TO COMPLETE THE WORK WITH THE LEAST DISRUPTION.
HOWEVER, YOU SHOULD BE AWARE OF THESE FACTORS: |
PRE-JOB SITE
SANDING REQUIREMENTS: |
 |
THE BUILDING SHOULD BE COMPLETELY
CLOSED IN, WITH OUTSIDE WINDOWS, AND DOORS IN PLACE. |
 |
ALL OTHER TRADES SHOULD HA
VE COMPLETED THEIR WORK AND NO OTHER TRAFFIC SHOULD
BE ALLOWED DURING THE SANDING AND FINISHING PROCESS. |
 |
AIR CONDITIONING, HEATING,
AND VENTILATION SYSTEMS SHOULD BE OPERATING. |
 |
THE TEMPERATURE AND RELAnVE
HUMIDITY SHOULD BE AT 'NORMAL LIVING CONDITIONS." |
 |
FURNITURE, APPLIANCES AND OLD
FLOOR COVERINGS SHOULD BE REMOVED DURING THE ENTIREPROCESS |
|
SANDING
AND FINISHING EXPECTIONS |
 |
THERE WILL BE NOISE, DUST
AND SOME V APORS DURING THE SANDING AND FINISHING
PROCESS. |
 |
EVEN THOUGH WE WILL SEAL OFF
THE WORK AREAS FROM OTHER ROOMS, DUST FROM THE
SANDING PROCESS COULD INFILTRATE TO OTHER AREAS
OF THE HOUSE. |
 |
BECAUSE OF THE V APORS THAT
WILL BE RELEASED DURING THE FINISH APPLICATIONS,
PILOT LIGHTS MAY NEED TO BE TURNED OFF. |
 |
PLEASE KEEP PETS AND CHILDREN
FROM THE WORK AREAS. |
 |
A TYPICAL FINISH JOB (APPROXIMATEL
Y 1,000 SQUARE FEET) TAKES
ABOUT 2 DAYS OF ACTUAL SANDING, WITH ONE DAY FOR THE STAIN TO DRY -MEANING
A FULL DRYING DAY, ON THE THIRD OR FOURTH DAY THE FIRST APPLICATION OF
FINISH IS DONE AND EACH FOLLOWING CONSECUTIVELY FOR
A TOT AL OF THREE COATS OF FINISH. |
 |
OUR WORK HOURS ARE FROM 6:45
a.m. to 4 p.m. |
 |
WHEN THE WORK IS COMPLETED
YOU MA Y FOLLOW WITH TOUCH UP PAINTING TO THE BASE
SHOE AND TRIM. PAINTING SHOULD AL WAYS FOLLOW FLOOR
SANDING WORK. |
 |
GENERAL CLEAN UP OF DUST MUST
ALSO FOLLOW THE WORK |
 |
FINISHES REQUIRE CURE TIME,
ALTHOUGH THEY MAY APPEAR DRY ON THE SURF ACE IT
IS BEST TO ALLOW AT LEAST 10 DAYS FOR RUGS OR ANY
HEA VY FOOT TRAFFIC. |
 |
AFTER THE JOB IS COMPLETED
YOUR ESTIMATOR WILL GO OVER THE JOB WITH YOU ON
SITE AND MAINTENANCE PROCEDURES WILL BE REVIEWED
. |
|
|
|